About the District
History of the District
Strategic Plan 2008
Board of Directors
Drop Box Locations

Utility Bill Information
Engineering Info.
Financial Information
Water Quality
Frequent Questions
Download Forms
Contact Us

Home

About Our District

Financial Information

Costs in the water industry continue to rise as regulations increase, and aging infrastructure requires upgrading and replacement. In 2010, the costs of construction for our upgrades and replacement projects were at record low prices; in 2011, we will continue to take advantage of savings on construction prices for these projects. Source water protection and system water quality improvements are also areas of emphasis in 2011.

Audit Financial Statements 2010 (PDF)
Audit Financial Statements 2009 (PDF)

2011 Adopted Budget (PDF)
2011 Budget Committee Meeting (DOC)
2011 Budget Committee Meeting 2 (DOC)

2012 Proposed Budget (PDF)


2011 Water Rates

The District Board adopted the 2011 water rates with no increase to the monthly minimum fees. The volume charge per 1,000 gallons of water use are increased for the first time since 2008, by approximately 5%.

Customer Class
Water Usage Charge /1,000 gallons
Residential
First 4,000 gallons
$3.15
Residential
Next 16,000 gallons
$4.00
Residential
Next 30,000 gallons
$5.10
Residential
Over 50,000 gallons
$6.30
Dual System
First 4,000 gallons
$3.15
Dual System
Next 4,000 gallons
$4.00
Dual System
Over 8,000 gallons
$13.30
Commercial
$3.70
Multi-housing
$4.10
Master Meter – Single System
All usage
$3.00
Master Meter – Dual System
Under usage limit/8,000 gal per dwelling
$3.15
Master Meter – Dual System
Over usage limit/8,000 gal per dwelling
$6.00
Commercial– Dual System
Under usage limit/8,000 gal per dwelling
$3.70
Commercial– Dual System
Over usage limit/8,000 gal per dwelling
$6.00
Landscape
Under 50,000 gal $/1,000 gal
$3.70
Landscape
Over 50,000 gal $/1,000 gal
$6.30
Hydrant
$6.70